Company scope of works
M A J Construction Div.
actively engaged in the following operations: -
General Construction,
Maintenance,Earth Works & Excavations
General Earthworks, and infrastructure works.
1.General Construction.
It includes all kinds of General
building construction activities such as paving, pouring of
concrete, buildings of Housing, multi-story buildings and
other infrastructure works, tiles work, finishing work,
structural demolition, and its maintances, etc…
2. General Earthworks.
All kinds of earthworks
(Roads, trenches, remedial works, maintances) it includes
site preparation, clearing and grubbing, duct banks,
drainage, culvert, ditches, excavations of all kind such as
soil, rock, subka, trenches, etc. and the underground
utility inspection, Installation of underground utility,
Pipes & cable laying, trust boring, de-watering, supply of
material, disposal of material, general back-filling,
backfill behind retaining wall, grading and compaction
works, testing, restoration of site, etc…
3. Road works
Construction activities of
Highways, Roads, Access roads, and grading, embankment,
sub-base, base-course, Asphalting works and its maintances.
4. Bridges work
Construction of bridges for
Highways and other roads, Flyover for road crossing,
Culvert, Duct bank, etc., and its maintances.
5. Dams
Special structural construction and
maintances of Dams, ponds, pools, dredging, breakwaters,
jetties, docks, piers, revetments etc.
To control these activities the
company well-equipped and well-experienced qualified
professional engineers, skilled labor and have prepared the
following documents
1.
General quality policy statement
2.
General quality control Plan
3.
Method statement for each activity
4.
Work procedure for each activity
5.
And the head office shall monitor the
execution of all activities for the fulfillment of its
quality policy and to prevent any deviation from its
respective method statement or work procedure to control the
quality plan
Quality
Assurance Plan
The quality assurance plan was
prepared by this organization to meet the requirements and
specification for the projects. For this purpose, good
condition equipment’s together with experienced staff were
combined with the organization management. The project
manager is responsible for running all over the project
operation for to monitoring and review the work performance,
and he and supporting staff are responsible to cover the
following activities.
1.
Planning and control of all
construction operations.
2.
All works related to engineering
trade.
3.
Material control.(Receipt, storage,
issuance)
4.
Inspection, monitoring and
supervision.
5.
Review of contract.
6.
Document control including drawings.
7.
Field and Lab testing.
Project Management and Supporting
Staff.
1.
Project Manager.
2.
QC / QA Engineer.
3.
Surveyors
4.
Supervisors
5.
Administrative officer.
Our Safety Plan
The purpose of this standard operating procedure
is to provide the policies, procedures, guidelines for
planing, organizing, co ordination and controlling for safe
performance of the project.
The objectives is to prevent injuries, loss of
life and property damages resulting from accident, such
accidents prevention can be achieved by identifying and /or
eliminating hazardous material, operation and conditions.
This safety programme shall be applied to all employees who
are engaged on this project.
This programme has been prepared on the nature
of work of the project. The safety programme and fire
prevention programme shall be regarded as composing part of
this programme together with the relative provision in
general conditions and technical specification of this
project and The Satet of Qatar Law regulations.
This procedure defines the
responsibility and authority for the implementation of the
project safety, as part of the Company Quality System.
Contract Quality Control
This includes:
A. Work included: Quality control of products and
workmanship Manufacture's instructions, field services, and
certificates Mockups.
B. Maintain quality control over supervision,
subcontractors, suppliers, manufactures, products, services,
workmanship, and site conditions, to produce Work in
accordance with the Contract Documents.
|